Case studies · problem, process, result

Four projects.
Documented results.

Two from Malaysian job sites, two from the work I do now. Each one is written the same way: what the problem was, what I built or ran, and what came of it.

Jan 2024–now · Founder

Virin Digital

AI workflows and websites for businesses in Kuala Lumpur.

Visit virindigital.com ↗
Screenshot of virindigital.com on desktop Screenshot of virindigital.com on a phone
Status
Live at virindigital.com
Work
AI agent workflows, websites
Base
Kuala Lumpur

The problem

Small service businesses lose enquiries to slow sites and manual intake: forms that land in an inbox nobody checks, and leads that wait days for a reply.

What I built

Hand-built websites, and AI agent pipelines for research, content and enquiry triage. Each pipeline has a checking step that tests the agent's output before anything reaches a client, and a budget that caps its cost.

Result

The studio's own site is live and serves as the first proof. Client case studies will be added here as clients approve them.

2024–now · Researcher and producer

Vinayak Tech

Long-form documentaries on AI, infrastructure and money.

Watch on YouTube ↗
Portrait of Vinayak recording a Vinayak Tech episode
Published
6 long-form episodes
Audio
Mastered to -14 LUFS
Motion
Remotion, built in-house

The problem

Stories about AI datacenters, power bills and pricing algorithms are usually told with opinions, not documents. Viewers rarely see the filings and numbers behind the claim.

What I built

A research process that starts from primary sources, a code-driven motion graphics pipeline in Remotion, and a sound chain mastered to broadcast loudness.

Result

Six long-form episodes published since September 2026, on AI datacenters, electricity bills, rent algorithms and ownership.

Mar 2024–now · Project operations and site supervisor

Rotol Group · Menara Maybank and KLCC towers

Rope-access façade work on commercial towers in Kuala Lumpur.

Portrait of Vinayak in a rope-access harness, holding his helmet
Safety record
0 LTI, 12+ months
Height
50+ storeys
Framework
HIRARC, DOSH Malaysia

The problem

Façade maintenance and rope-access rigging at 50+ storeys on Menara Maybank and KLCC-district towers, in tropical wind, with no margin for error.

What I ran

Safe Work Method Statements, pre-rig load checks, permit-to-work gates, a wind-speed cutoff read from an anemometer, and a rescue plan for every drop.

Result

Zero lost-time incidents over 12+ consecutive months, and formal sign-off from the building managers on completed work.

2021–24 · Site engineer, structural QA/QC

WCT · Tun Razak Exchange

Malaysia's 70-acre international financial district.

Development
70 acres, $10B+
NCRs in my zones
100% closed at root cause
Trades
Civil, structural, architectural, MEP

The problem

Many contractor teams working across civil, structural, architectural and MEP packages on one site, where a defect caught after a pour costs weeks.

What I ran

Inspection against drawings before concrete pours, Non-Conformance Reports traced to their root cause, and handoffs between trades.

Result

Every NCR in my zones closed at root cause without recurring, with a complete audit trail for consultant sign-off.